Processing, Baseline and First Three Surveys--Fig. 1 |
|||
|
Return to Processing report...
Figure 1--A 2-D slice from the baseline survey during November 2003 with the approximate top of the Lansing-KC interval interpreted in red and an ellipse defining the area immediately below the L-KC appearing to change most dramatically when contrasted with the same 2-D cross line slice of the June 2004 survey.
Return to Processing report...
Kansas Geological Survey, 4-D Seismic Monitoring of CO2 Injection Project Placed online April 14, 2005 Comments to webadmin@kgs.ku.edu The URL is HTTP://www.kgs.ku.edu/Geophysics/4Dseismic/Process/Nov_2003/fig1.html |