June 2003 Site Visit--GPS Survey |
During the June 18, 2003 visit, several key farmers were contacted who had land within the grid. Each expressed a strong interest in the project and willingness to work with us to insure we get year-around access.
After on-site discussions with a representative from Murfin Drilling (operators of this lease), a location for a semi-permanent monument was established immediately south of the injection well. Once the marker was placed it was located absolutely and will be used to definitively locate and deploy the grid each time survey data are acquired.
A smaller version of this photo is available.
Kansas Geological Survey, 4-D Seismic Monitoring of CO2 Injection Project Placed online July 2, 2003 Comments to webadmin@kgs.ku.edu The URL is HTTP://www.kgs.ku.edu/Geophysics/4Dseismic/Reports/June2003Visit2.html |